Fiscal Year 2015/16

The following list identifies areas on campus that have undergone upgrades of telecommunications cabling and installation of additional wireless access points (WAPs). 

This is a multi-year project. Learn about progress made in other years:

Fiscal Year 2013/14

Fiscal Year 2014/15

Fiscal Year 2016/17

Fiscal Year 2017/18

This list is in the order work is planned and will continue to be updated as scheduling may change and as work is completed.

*Areas with an asterisk received updated WAPs (hardware) where WAPs already existed.

(Tip:  to find a specific building, in most browsers you can use the “find” feature by simultaneously pressing Ctrl+F and typing in the building name. You can also use the table column headings to sort in alphabetical or numerical order.)

Building

Area

Start Date

Status

CPAC Dance

S103

7/2/2015

completed 7/15/2015

CPAC Dance

Dance Offices

7/2/2015

completed 7/15/2015

Kinesiology

room 121

7/16/2015

completed 7/17/2015

Family and Consumer Science

most areas

7/20/2015

completed 8/4/2015

Academic Services

Beach Hut Patio

8/4/2015

completed 9/1/2015

Human Services and Design

room 117

8/4/2015

completed 8/31/2015

Social Sciences / Public Affairs

room 024

8/4/2015

completed 8/31/2015

Kinesiology

room 82 / Soccer

8/4/2015

completed 8/28/2015

Vivian Engineering Center

rooms 330 / 331

8/4/2015

completed 9/1/2015

Engineering and Computer Science

room 413

8/4/2015

completed 8/31/2015

Engineering and Computer Science

room 302

8/4/2015

completed 8/31/2015

Engineering and Computer Science

room 115

8/4/2015

completed 8/31/2015

College of Business

3rd floor

9/4/2015

completed 9/21/2015

College of Business

Main Lecture Halls139/140

9/28/2015

completed 10/21/2015

Academic Services

2nd floor

10/14/2015

completed 10/21/2015

Engineering 3

room 116

 

completed 11/3/2015

Kinesiology

rooms 26 / water polo

 

completed 11/4/2015

MLSC

1st

11/9/2015

completed 12/4/2015

MLSC

2nd

12/7/2015

completed 12/2015

MLSC

3rd

12/14/2015

completed 1/2016

Microbiology

Lower Level

1/19/2016

completed 2/1/2016

Microbiology

1st floor

2/1/2016

completed 2/16/2016

Microbiology

2nd floor

2/16/2016

completed 2/29/2016

Microbiology

3rd floor

2/29/2016

completed 3/10/2016

(Last updated 01/27/17)

Read the Annual Report for Fiscal Year 2015/16 with graphical representations of the improvements.
 