Pending Waitlist

The following list identifies areas on campus that are waiting for upgrades of telecommunications cabling and replacement or installation of additional wireless access points (WAPs).  This is a multi-year project, so progress is based on future funding.

This list will continue to be updated as scheduling may change and as work is completed.

*Areas with an asterisk received new WAPs (hardware) where WAPs may have already existed.

(Tip:  to find a specific building, in most browsers you can use the “find” feature by simultaneously pressing Ctrl+F and typing in the building name. You can click the table column headings to sort in alphabetical or numerical order.)

Building

Area

Status

Engineering Technologyroom 239Pending (near future)
Engineering Technology1st floorPending (near future)
Engineering Technology 2nd floorPending (near future)
Library2nd and 3rd floors Pending (near future)
Library1st and Lower LevelPending (near future)
Studio Theater1st   floorPending (near future)
Studio Theater2nd   floorPending (near future)
Fine Arts 21st   floorPending (near future)
Fine Arts 22nd   floorPending (near future)
Peterson Hall 1ALL   areasPending (near future)
Engineering / Computer Science5th and   6th floorPending (near future)
Fine Arts 31st   floorPending (near future)
Fine Arts 32nd   floorPending (near future)
Fine Arts 41st   floorPending (near future)
Fine Arts 42nd   floorPending (near future)
Faculty Office 41st   floorPending (near future)
Faculty Office 42nd   floorPending (near future)
Liberal Arts 11st   floorPending (near future)
University Police Pending (near future)

Learn about progress made in other years:

Fiscal Year 2013/14

Fiscal Year 2014/15

Fiscal Year 2015/16 

Fiscal Year 2016/17

Fiscal Year 2017/18


(Last updated 02/12/18)


 

Learn about progress on Computer Lab improvements funded by the Student Excellence Fund (SEF).